Investment summary
Business highlights
- Renewable energy based on the energy in the waves
- Electricity production & desalination (potable water) planned
- Non-intrusive: Does not spoil the view, nor the environment
- €5.5M EU grants secured for demonstration at commercial scale
Idea
Introduction
Our vision is to make wave energy an important player in the portfolio of renewable energy sources, ensuring a reliable supply of clean energy and clean drinking water.
The wave power potential is huge. We believe that wave power can cover 50 pct. of the world's electricity needs.
Our initial focus is on islands, hotel resorts and remote coastal areas. Around the world a large number of these communities are relying on diesel generators as their main power supply. We believe wave energy plays a crucial role in replacing these.
Wavepiston is a patented, breakthrough technology. In optimal conditions, Wavepiston systems are initially expected to deliver electricity at a cost of €0.2 per kWh as opposed to an average cost of € 0.38 per kWh from diesel generators.
We expect that desalinated water can be produced at a price of €1 per m3. Prices are expected to drop significantly as technology matures.
Wavepiston is easy to transport and install. Installations are non-intrusive, with low visual impact and with no negative environmental effects recorded or anticipated.
Substantial accomplishments to date
• 2009: The conceptual patent on Force Cancellation awarded.
• 2008 – 2013: Over €200k raised from private equity and thousands of hours of work invested.
• 2010 – 2011: Proof of concept through scale 1:30 model tests in wave tank at Aalborg University.
• 2012 – 2013 - Offshore testing with scale 1:9 model at Nissum Bredning, Denmark.
• 2014 – 2019: € 2.9M raised via partners, grants and private equity.
• 2014 – 2019: Development and offshore testing of prototype scale 1:4 - 1:2 in The North Sea off Hanstholm, Denmark.
• 2018 – 2019: Raised EUR 5.5M in grants from EU programmes SME Phase 2 and Fast Track to Innovation for two full-scale demonstration projects.
• 2020: First installation of the full-scale demonstration system at Gran Canaria, Spain, started in November 2020.
Monetisation strategy
Wavepiston is a wave energy technology provider. We plan to develop and demonstrate the Wavepiston system 2020-2022, and then install wave powered electricity and desalination plants in co-operation with project developers.
From 2022, Wavepiston is expected to enter the commercial phase based on results from the full-scale installations. Wavepiston systems will be sold as turn-key projects. To minimise the risk for the customers on the initial projects, Wavepiston will play an active role together with project developers to prepare and secure funding on behalf of the customer, and to execute the projects successfully.
The first commercial system is expected to be installed in 2023. We have ongoing investigations at several, specific locations e.g. Canary Islands, Cap Verde, Maldives, Malta, Martinique, Marshall Islands, Philippines, and Sardinia. The specific investigations are reflecting a total of 45 MW installed capacity, reflecting a turnover of €220M potential.
Use of proceeds
Wavepiston's demonstration phase budget from 2019-2022 is estimated at €9.7M. Of this, €5.5M is secured already from EU grants, €0.7M is secured from Co-developers, and finally €3.5M in equity is required. This campaign forms part of the equity raised, with €2m being targeted now, and any remaining balance of the €3.5m to be raised next year. This budget is intended to be used to demonstrate the technology at full-scale and to prepare for commercialisation. Elements include:
A. Full-scale demonstration project with electricity production connected to a micro grid.
B. Full-scale demonstration project with a combined electricity production and desalination system.
C. If applicable enter a partnership with a large industrial partner – First exit possibility for investors.
D. Prepare the first small commercial wave power systems on an island or a coastal community replacing diesel generators for both electricity and desalination.
Critical Success Factors for this phase:
• Demonstrate power to grid.
• Demonstrate desalination potential.
• Optimise power production.
• Optimise production of desalinated water.
• Optimise for large scale production.
• Agreement on a commercial project at an island or coastal community.
Key Information
Share Classes
Please note, Wavepiston has 2 share classes outstanding, A and B.
A shares are held by the founders, with B shares held by investors.
Investors in this round via Seedrs will be issued with B shares. These shares are the highest ranking share and have preferential dividend rights to A shares.
Currencies
Please note, other investors in this round are investing in Danish Krone (DKK). The share price for the round is set at 81.5 DKK.
Investments made in Wavepiston in DKK are converted at the ECB reference rate as of 23/11/2020 when being reflected in the progress bar of the campaign. Any investment in Wavepiston in DKK will be converted with an exchange rate of 7.4472 DKK per Euro for the duration of the campaign.
Open an account to get access to the team members of Wavepiston
Already have an account? Log in
To comply with financial regulations, we can only show full campaign details to registered users.
Only shareholders can access this page
If you successfully purchase a share lot of this business, you will be granted access.
Buy sharesOnly shareholders can access this page
If you successfully purchase a share lot of this business, you will be granted access.
Buy sharesOnly shareholders can access this page
If you successfully purchase a share lot of this business, you will be granted access.
Buy sharesOnly shareholders can access this page
If you successfully purchase a share lot of this business, you will be granted access.
Buy shares